800.226.9094  |   Log In
View Article

OWC first tech manufacturer/distributor in U.S. to become 100% on-site wind powered
Source: MacDailyNews, October 22, 2009
View Full Article
PACEworx™ News Article Recap:
Other World Computing (OWC), Woodstock, IL, a top technology company, announced today that it has become the first technology manufacturer/distributor in the U.S. to become 100% on-site wind powered by switching its daily operations energy needs over to a Vestas V39-500 kW wind turbine. Completely on-site powered, OWC can run its resource conserving LEED Platinum designed facility and internet operations datacenter 100% on this renewable, non-polluting power source.

With peak wind conditions, the OWC wind turbine can generate more energy in a single week than what OWC's operations require for an entire month.

As part of the overall vision unveiled in 2006 for the new OWC corporate headquarters, the OWC wind turbine installation was designed to produce power at winds speeds as low as nine mph based upon the OWC campus site conditions average wind speed of 10-15 mph. Whenever there isn't sufficient wind power generation, the local utility company will remain as the backup power source for OWC.

The OWC wind turbine installation is the most recent addition to the energy efficient, resource conserving, and low environmental impact OWC facility. The building, completed in 2008 and currently in the final approval stages for the highest LEED rating of Platinum, features:

* Geo-thermal ground-coupled heat pump system

* Fiber optic rooftop light-harvesting technology

* High insulation value materials throughout the building for reduced energy use

* Sloan high-efficiency hand driers in washrooms for energy/paper savings

* High-efficiency drinking water filtration system to eliminate need for delivered water

OWC's facility, with all of its energy saving technologies, is an ideal match for on-site wind power generation.


Mentioned:
Carbon Offsets:No
Green Building:No
Energy Technology:
    HVAC Technologies
   Emerging Technologies
   Energy Conservation
   General Energy Management Technologie


Property:
Other World Computing
    LEED Building:Yes
    Energy Star Cert.:No

Corporations:
Other World Computing

People:
Larry O'Connor
CEO

Other World Computing



PACEworx News Published Date: October 26, 2009
View Full Article - Note, links to articles may be removed by the original source.
 
 
 
 
 
 
Most Read News (See all)
  • March 28, 2017

    ‘Property assessed’ financing for solar panels reveal serious problems for Realtors, lenders
    Read more...

  • June 06, 2017

    Oakland, CA's Laney College Receives $3.6 Million Grant
    Read more...

  • June 06, 2017

    City of Fort Pierce, FL, and the SELF Offer Solutions for Commercial Property Improvements
    Read more...

 
 
Todays News (See all)
  • Connecticut Makes Favorable Changes to its Commercial PACE Financing Program

    On July 11, 2017, the Connecticut General Assembly enacted H.B. 7208 ("Revised C-PACE Statute") to make several minor changes to the existing statute...
    Read more...

  • PACE program, a closer look City council to hold discussion on ‘energy efficient’ program

    When the Ridgecrest City Council meets tonight at 6, one topic is likely to be a hot one, no pun intended. Council will be discussing the...
    Read more...

  • Lisbon council OKs articles for schools, sewer work

    LISBON, ME - The Town Council on Tuesday evening approved two money articles for voters to decide at the polls Nov. 7. The first asks for $1.65...
    Read more...